Internal cleaning and pigging are one of the most essential parts of the maintenance of the pipeline. It requires a huge amount of personal safety and productivity level the slightest slip-up can cause irrepressible damage to the pipe.
Tiratna Enterprise is well-trained and had completed various diameter pipelines with long-distance pig running experience in many challenging locations for our clients.
To name a few:
- Gas pigging and cleaning of 500mm NB of 23.117 km from AGCL compressor station to NTPS.
- Modification, gas pigging and cleaning work of DULIAJAN to DIBRUGARH PIPELINE, TENGAKHAT TO TINSUKIA PIPELINE, TINSUKIA TO DOOMDUMA PIPELINE.
- Experience running an Electronic Pig Locator with transmitter-receiver and operators for Identifying the location of cleaning pig stuck up inside 17 km long from LOC HNE to STF section of the Baghjan.